5
(在维基百科上找到的大楼介绍:)
=========
Profile
Address: The Osaka prefecture Osaka city Fukushima Ku Fukushima
5-4-21
Completion: 1992
Site area: 2,353 m2
Construction area: 760 m2
Total floor area: 7,956 m2
Structure: Steel-frame reinforced concrete structure and part
cage
Height: 71.9 m
Rank: Terrestrial 16 floors, underground 2 floors and tower house 1
floors
Main use: Office
Client: End 澤 industrial corporation
Designer: Catalpa design and Yamamoto Nishihara architectural
design office
Builder: Sato industry
History
The area authority of this land from early Meiji era had operated
the fire-wood industry and the like at this place, but because the
company building deteriorated, we had decided to reconstruct in
1983. But, because it has been decided that the highway passes due
to city planning construction permit did not descend. Area
authority side because you cannot transfer, it negotiated the Osaka
and Kobe highway public corporation (at that time) with over
approximately 5 years, conclusion it did by the fact that it passes
through the highway to the building.
Like this case, site purchase becomes necessary when it passes through the highway and the like, but because there is a circumstance even on area authority side, there is many a thing to which site purchase succeeds always and not to limit becomes problem.
Because of that, portion of road method, city planning method, urban renewal method and construction standard method was amended in 1989, one improvement of the road and the building etc was recognized, the three-dimensional road system was enacted (as for originally this system, annulation 2 around the Tokyo Minato-ku Toranomon the line (as for the part of that the alias MaARTHUR road is called) construction promotion was purpose, but it was not applied result). Because of this, it reached the point where the building which the highway penetrates can be built. The gate tower building is the building which for the first time utilizes the three-dimensional road system in Japan. But usually, being general on the underground to arrange the building in the road and the ground, as for the road part penetrating the building quite it is rare.
然后92年完工。